Installingand debugging
Executive standard
GB50116-2013 < Automatic fire alarmsystem design specifications>
GB50166-2007 <Construction andacceptance normative implementation>
GB50370-2005 <gas fire extinguishingsystem design standard>
GB50263-2007 <gas fire extinguishingconstruction and acceptance normative implementation>
Servicecontent
Gas fire extinguishing debugging
1. single machine commisioning: Probe testing, alarm devicetesting, delay start time test, the electromagnetic valve of testing
2. Joint commisioning: debugging with FAS system, automatic fire alarm status,and the choice of valve movements, gas discharge signal feedback Ventilationsystem closed, the fire power to cut off the function debugging, each signalfeedback control center.
Alarm system debugging
1. single machine commisioning:Fire detector, manual alarm button, sound and light alarm, floor indicatordebugging
2. joint commisioning:According to the correlation,automatic fire extinguishing system, indoor and outdoor fire hydrant system,smoke exhaust and ventilation air conditioning system, fire doors and activitytype fire separation facilities, fire emergency lighting and evacuationindicating marking system, fire control communication equipment and fireemergency broadcasting system, fire control power supply and distributionsystem, fire water supply system, fire extinguisher joint tests, each signalfeedback control center.
Automaticsprinkler system
1. single machine debugging: end water-testing device、water-flow indicator、wet alarmvalve, single pump operation, main/standby pump test.
2. joint commissioning: joint with fire alarm system, through the waterat the end, the flow indicator alarm, wet alarm valve pressure switch alarm,realize the linkage to start the spray pump, each signal feedback controlcenter.
Indoor and outdoor fire hydrant systemdebugging
1. single machine debugging: Firehydrant button action test running, fire hydrant, fire hydrant pump singlemain/standby pump running debugging.
2. joint commissioning: linkedwith fire alarm system ,start fire hydrant pump through the fire hydrant buttonand each signal feedback control center
Smokeexhaust&ventilation and air conditioner system
1. single machine debugging: smokeexhaust valve, air supply valve test, fire valve test, smoke fan operationcommissioning, tuyere wind speed test.
2. commissioning debugging: startwith fire alarming system, according to the joint program, through the firedetector, manual alarm button alarm signal, smoke control valve, jointly startcorresponding smoke exhaust fan, the signal feedback control center.Smoke fanoperation commissioning, tuyere wind speed test.
Firedoor and activity type fire separation facilities debugging
1. single machine debugging: By manual lifting on either side of the fire shutter buttonaction make fire shutter running up and down and up and down limit accurately
2. commisioningdebugging:jointwith fire alarm system. According to thejoint program, it triggers the smoke temperature detector, on either side ofthe fire shutter as fire shutter fire compartmentation, once fell to theground; Asthe fire shutter on the evacuation passageway two drops, smoke alarm, the firstdrop of 1.8 M, temperature sense of alarm, the second fell to the ground, thesignal feedback control center
Fire emergency lighting and evacuation indicating systemdebugging
1. single machine debugging: evacuation instructions logoshould keep on normally;Fire emergency lightingin open automatically when the power is lighting;
2. commisioning debugging: Jointwith fire alarming system, according to the joint program, through the firedetector, manual alarm button alarm linkage fire cut off the power supply, fireemergency lighting open lighting system automatically.
The fire emergency broadcasting system debugging
1. singleemergency: to check each fire radio voice situation step by step through fireemergency radio host signal accident radio voice.
2. commissioningdebugging:to checkeach fire radio voice situation step by step Through fire emergency radio hostsignal accident radio voice and fire alarm system, according to the jointprogram, the ground floor and second floor above the alarm, the locking layerand adjacent to the lower level radio open;Alayer of alarm, the locking layer, layer and underground layer accident radioopen;Anyfloor underground alarm and linkage broadcast on each layer and a layer ofunderground accidents..
執(zhí)行標(biāo)準(zhǔn)
GB50116-2
013 《火災(zāi)自動(dòng)報(bào)警系統(tǒng)設(shè)計(jì)規(guī)范》
GB50166-2007 《火災(zāi)自動(dòng)報(bào)警系統(tǒng)施工及驗(yàn)收規(guī)范》
GB50370-2005 《氣體滅火系統(tǒng)設(shè)計(jì)規(guī)范》
GB50263-2007《氣體滅火系統(tǒng)施工及驗(yàn)收規(guī)范》
服務(wù)內(nèi)容
氣體滅火系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:探測器測試、警報(bào)裝置測試、延時(shí)啟動(dòng)時(shí)間測試、電磁閥動(dòng)作測試。
2. 聯(lián)合調(diào)試:與FAS系統(tǒng)的火警、手自動(dòng)狀態(tài)、選擇閥動(dòng)作、氣體噴放信號的反饋調(diào)試;通風(fēng)系統(tǒng)關(guān)閉,非消防電源切斷功能調(diào)試,各信號反饋消控中心。
報(bào)警系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:火災(zāi)探測器、手動(dòng)報(bào)警按鈕、聲光報(bào)警器、樓層顯示器調(diào)試。
2. 聯(lián)合調(diào)試:根據(jù)聯(lián)動(dòng)關(guān)系,對自動(dòng)滅火系統(tǒng)、室內(nèi)外消火栓系統(tǒng)、防煙排煙與通風(fēng)空調(diào)系統(tǒng)、防火門及活動(dòng)式防火分隔設(shè)施、火災(zāi)應(yīng)急照明和疏散指示標(biāo)志系統(tǒng)、消防通訊設(shè)備及火災(zāi)應(yīng)急廣播系統(tǒng)、消防供電和配電系統(tǒng)、消防供水系統(tǒng)、消防滅火器的聯(lián)合測試,各信號反饋消控中心。
自動(dòng)噴淋系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:末端試水裝置、水流指示器、濕式報(bào)警閥,水泵單機(jī)運(yùn)行,水泵主備用切換測試。
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),通過末端放水、水流指示器報(bào)警、濕式報(bào)警閥壓力開關(guān)報(bào)警,實(shí)現(xiàn)噴淋泵聯(lián)動(dòng)啟動(dòng),各信號反饋消控中心。
室內(nèi)外消火栓系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:消火栓按鈕動(dòng)作測試、消火栓泵單機(jī)運(yùn)行、消火栓泵主備用切換運(yùn)行調(diào)試。
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),通過消火栓按鈕實(shí)現(xiàn)消火栓泵聯(lián)動(dòng)啟動(dòng),各信號反饋消控中心。
防煙排煙與通風(fēng)空調(diào)系統(tǒng)
1. 單機(jī)調(diào)試:排煙閥、送風(fēng)閥動(dòng)作測試,防火閥動(dòng)作測試,防排煙風(fēng)機(jī)運(yùn)行調(diào)試,風(fēng)口風(fēng)速測試。
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),根據(jù)聯(lián)動(dòng)程序,通過火災(zāi)探測器、手動(dòng)報(bào)警按鈕報(bào)警信號,聯(lián)動(dòng)開啟防排煙閥,聯(lián)動(dòng)啟動(dòng)相應(yīng)防排煙風(fēng)機(jī),各信號反饋消控中心。
防火門及活動(dòng)式防火分隔設(shè)施調(diào)試
1. 單機(jī)調(diào)試:通過防火卷簾門兩側(cè)的手動(dòng)升降按鈕操作使防火卷簾門上下運(yùn)行正常且上下限位準(zhǔn)確。
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),根據(jù)聯(lián)動(dòng)程序,觸發(fā)防火卷簾門兩側(cè)的煙溫感探測器,作為防火分隔的防火卷簾門,一次下降至地面;作為疏散通道上的防火卷簾門分兩次下降,煙感報(bào)警,第一次下降1.8M,溫感報(bào)警,第二次下降至地面,各信號反饋消控中心。
火災(zāi)應(yīng)急照明和疏散指示標(biāo)志系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:疏散指示標(biāo)志應(yīng)保持常亮;火災(zāi)應(yīng)急照明在斷電后自動(dòng)開啟照明;
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),根據(jù)聯(lián)動(dòng)程序,通過火災(zāi)探測器、手動(dòng)報(bào)警按鈕報(bào)警信號聯(lián)動(dòng)切斷非消防電源時(shí),火災(zāi)應(yīng)急照明系統(tǒng)自動(dòng)開啟照明。
火災(zāi)應(yīng)急廣播系統(tǒng)調(diào)試
1. 單機(jī)調(diào)試:通過火災(zāi)應(yīng)急廣播主機(jī)發(fā)出事故廣播語音信號,逐層檢查每個(gè)消防廣播的發(fā)聲情況。
2. 聯(lián)合調(diào)試:與火災(zāi)報(bào)警系統(tǒng)聯(lián)動(dòng),根據(jù)聯(lián)動(dòng)程序,地上二層及二層以上報(bào)警,聯(lián)動(dòng)本層及相鄰上下層事故廣播開啟;一層報(bào)警,聯(lián)動(dòng)本層、二層及地下各層事故廣播開啟;地下任意層報(bào)警,聯(lián)動(dòng)地下各層及一層事故廣播開啟。