久久国产精品九九国产精品_国产精品欧美日韩中字一区二区_在线免费黄色网址_国产深夜福利在线观看网站_18禁秘 啪啪污污网_日韩在线一区二区三区视频_国产农村乱对白刺激视频亚洲性爱在线_蜜臀AV中文无码字幕色三_国产日韩欧美午夜片_人人公开免费超级碰碰碰视频

Cylinder Repair

Home > After-sale Service > Cylinder Repair

Operation standard

1. GB50263-2007 <Gas fire extinguishing systemconstruction and acceptance specification>

2. <Gas cylinder safety supervision procedures>2000 edition

3. GB13075-1999 <Steel welding gas cylindertest and evaluation on a regular basis>

4. GB13004-1999 <Steel seamless gas cylinderregular inspection and assessment>


Testingservice content

1.Equipment dismantling

Dismantling and implementation plan, personnel, organization,preparation tools, protective measures, dismantling, dose field verificationand record, equipmentprotection. 

2.Equipment freight back tothe factory

Vehicle preparation, loading machinepreparation, transport protective measures, to the factory confirmation of discharge(quantity and appearance), equipment storage.

 3.Detection and filling

(1) Fire extinguishing agent empty or recycling;The cylinderinternal peer damage rust and processing;The cylinder wall thicknesstesting;The cylinder strength test and test;Fire extinguishing agentfilling;Sealing check;In leakage detection;The cylinder surface anti-corrosiontreatment;

(2)To inform the clients in time and offerprice in time when finding the failure parts and components.    The corresponding parts could be changed afterthe consent of the customers’ approval. 

4.Equipmentfreight back to the scene.

Verificationof equipments’ number, appearance and information; vehicles preparation; Loadingmachines’ preparation; transport protective measures; loading confirmation onthe spot (number and appearance)

5.equipmentinstallation、debugging、acceptance

Personnelorganization, tool preparation, set in place, pressure check, linkagedebugging, gas pipe network system, alarm system electrical connections,environment cleaning, submit relevant information, together with the owneracceptance;

6.System training,transferring

Tohave the system principle, operation, daily check’s training towards safetymanagement staffs、computer rooms’ workingstaffs、safety guards on thespot. 

7. Gas cylinders’ renting(optional)

during the period of checking, those owners having renting requirementscan propose renting case for choosing. 

8.safety measures of the whole process

(1)When loading and unloading the cylinders, they must be installed and unloadedlightly.  It is forbidden to collision、throw、slip or roll on the ground. Do not put the bottle of head valve in the alignment person, payattention to prevent bottle group head of valve cap fell off.

(2)During Transportation, IG - 541 \ CO2 bottles group must use steel bottle of headvalve cap protection. It could be flat or vertical position, when the flat barheight shall not exceed the vehicle protection plate, with triangle wood matcard prison, prevent rolling;Group of seven fluorin propane bottle must withthe bottle of head valve bubble shield to protect, should be kept upright;

(3) In bottle grouptesting, meanwhile, to ensure the safety of the protection zone for patrolofficers on duty, it is demanding to increase the number building inspection.To pay special attention to the protection zone and increase the portable fireextinguisher at the gate of the each protection zon



Contact

Us