久久国产精品九九国产精品_国产精品欧美日韩中字一区二区_在线免费黄色网址_国产深夜福利在线观看网站_18禁秘 啪啪污污网_日韩在线一区二区三区视频_国产农村乱对白刺激视频亚洲性爱在线_蜜臀AV中文无码字幕色三_国产日韩欧美午夜片_人人公开免费超级碰碰碰视频

Technical Disclosure

Home > Technical Service > Technical Disclosure

Project technical clarification

1)   project techinical clarificationcan be divided into two categories: technical support design project、othercompanies’ design project. 

2)   Design project should be onthe field survey, according to party a's requirements for deepening the designbefore construction, the three authorized by the director, cover design thestamp out figure.

3)   Ifthe projects are designed by our own technical support team, project directorof engineers need to hand over construction drawings.  Project leader needs to reviewthe drawings and put forward reasonable Suggestions, ensure compliance with theconstruction acceptance criteria.

4)   Accordancewith the requirements of engineering task list, for engineering constructionpersonnel for data transfer, including project budget, equipment list,construction drawings, etc;

5)   Projectapproach to the project before the construction site technical disclosure:participate in project design disclosure and technical disclosure on thebuilder, team.

6)   Communicate with party a'srepresentative, the related supervision, project technology, engineeringconstruction project director, head of the positive communication, and otherrelevant departments actively cooperate with, do a good job project disclosureof the parties agree to sign and record;

7)   Project leader should focus onthe progress of the project, constructing mateirial order according to theprogress of the production task、construction material order. Toassist construction team leader to Preparethe project contact list and coordinate positively about the technical problemsduring the project engineering process, ensuring the project can be processedsmoothly.  


Contact

Us